Painter — Brighton, Boston MA

Exterior Painting in Brighton, Boston MA

Full pressure wash, scrape back anything loose, feather the edges, replace rotted wood, caulk every gap, prime bare surfaces, then two coats.

Brighton specifics

Most of what we paint in Brighton is three-deckers and brick apartment blocks. Three-deckers and two-families, 1920s brick apartment blocks, and Victorian and Colonial Revival single-families in Oak Square and Aberdeen. Aberdeen is a designated architectural conservation district under the Boston Landmarks Commission. Exterior work visible from the street goes through design review, and that includes colour.

Two-family porch and new brick steps after finishing
Red gambrel three-family being repainted

Our process

Full pressure wash, scrape back anything loose, feather the edges, replace rotted wood, caulk every gap, prime bare surfaces, then two coats.

Wash, then let it dry — 48 hours minimum, longer on north elevations that never see sun. Then scrape everything lifting, feather the edges with 80 grit so the transition doesn't telegraph through the finish, spot prime bare wood the same day it's exposed, and caulk after priming rather than before so the caulk bonds to primer instead of raw grain.

Common failure we see

Nearly every failed exterior we're called to repaint failed for the same reason: someone coated over chalky, damp or mildewed siding. Paint doesn't stick to dirt, and no product on the shelf fixes bad prep.

What the quote covers

  • Line-by-line scope — prep, materials and labour costed separately
  • A real start date and duration, held to
  • Licence #193121 and certificate of insurance in writing
  • Two-year workmanship warranty

Products are Benjamin Moore and Sherwin-Williams. Worth reading before you hire anyone: EPA Renovation, Repair and Painting rule National Weather Service Boston forecast

Common Questions

Questions We Get Asked

How long will it last?

Eight to twelve years with full prep and quality product. Three to five with neither. The difference is almost entirely in what happens before the finish coat.

What if it rains mid-job?

We watch the forecast and stage the work so nothing gets coated inside the window before rain. If we're caught out, the affected area gets reassessed rather than coated over.

Do you paint in the fall?

Through October most years, sometimes into November. The limit is surface temperature and dew point, not the calendar.

Are you licensed and insured?

Massachusetts HIC #193121 with general liability and workers' compensation. Verify it on Mass.gov CheckAHire — for us and for anyone else quoting you.
Get Started

Ready for Your Exterior Painting Estimate in Brighton, Boston?

We walk the property, measure it, and send a written itemised quote — normally inside 24 hours. No pressure, no obligation.

Call (617) 777-7700 Send a Message

Licensed #193121  ·  Fully insured  ·  2-year workmanship warranty

Call Now