Painter — South Boston, Boston MA

Exterior Painting in South Boston, Boston MA

Full pressure wash, scrape back anything loose, feather the edges, replace rotted wood, caulk every gap, prime bare surfaces, then two coats.

On South Boston properties

Most of what we paint in South Boston is three-deckers and rowhouses. Three-deckers, brick and wood rowhouses, and a large number of condo conversions with shared exterior responsibility. Fort Point is loft conversions in former industrial buildings. Southie sits on the water. Salt accelerates coating breakdown and corrodes fasteners, and exterior products need to be specified for it.

Three-family exterior finished in green with white trim
Two-family porch and new brick steps after finishing

The way we work it

Full pressure wash, scrape back anything loose, feather the edges, replace rotted wood, caulk every gap, prime bare surfaces, then two coats.

Wash, then let it dry — 48 hours minimum, longer on north elevations that never see sun. Then scrape everything lifting, feather the edges with 80 grit so the transition doesn't telegraph through the finish, spot prime bare wood the same day it's exposed, and caulk after priming rather than before so the caulk bonds to primer instead of raw grain.

Common failure we see

Nearly every failed exterior we're called to repaint failed for the same reason: someone coated over chalky, damp or mildewed siding. Paint doesn't stick to dirt, and no product on the shelf fixes bad prep.

What the quote covers

  • Line-by-line scope — prep, materials and labour costed separately
  • A real start date and duration, held to
  • Licence #193121 and certificate of insurance in writing
  • Two-year workmanship warranty

Products are Benjamin Moore and Sherwin-Williams. Worth reading before you hire anyone: EPA Renovation, Repair and Painting rule National Weather Service Boston forecast

Common Questions

Questions We Get Asked

How long will it last?

Eight to twelve years with full prep and quality product. Three to five with neither. The difference is almost entirely in what happens before the finish coat.

What if it rains mid-job?

We watch the forecast and stage the work so nothing gets coated inside the window before rain. If we're caught out, the affected area gets reassessed rather than coated over.

Do you paint in the fall?

Through October most years, sometimes into November. The limit is surface temperature and dew point, not the calendar.

Are you licensed and insured?

Massachusetts HIC #193121 with general liability and workers' compensation. Verify it on Mass.gov CheckAHire — for us and for anyone else quoting you.
Get Started

Ready for Your Exterior Painting Estimate in South Boston, Boston?

We walk the property, measure it, and send a written itemised quote — normally inside 24 hours. No pressure, no obligation.

Call (617) 777-7700 Send a Message

Licensed #193121  ·  Fully insured  ·  2-year workmanship warranty

Call Now