Siding Repair in Fenway, Boston MA
Damaged courses replaced and profile-matched, then primed on all sides before they go up.
Fenway specifics
Carpentry comes before coating on Fenway exteriors. Most Fenway work is hallways, stairwells and lobbies in occupied buildings — high traffic, tight sequencing, and finishes that have to survive constant use. We repair or replace it first, because paint over soft wood buys a season.
The way we work it
Damaged courses replaced and profile-matched, then primed on all sides before they go up.
Damaged courses come out individually rather than cutting a patch panel. New stock gets primed all six sides before installation, and the butt joints get staggered away from the ones above and below so water can't track straight down.
Where these jobs go wrong
Face-nailing replacement clapboard through the course below it. It looks fine until the boards move seasonally and split at every nail.
What the quote covers
- Line-by-line scope — prep, materials and labour costed separately
- A real start date and duration, held to
- Licence #193121 and certificate of insurance in writing
- Two-year workmanship warranty
Products are Benjamin Moore and Sherwin-Williams. Worth reading before you hire anyone: Mass.gov guide to hiring a contractor
Questions We Get Asked
Can you match my siding?
Repair or reside?
Are you licensed and insured?
Ready for Your Siding Repair Estimate in Fenway, Boston?
We walk the property, measure it, and send a written itemised quote — normally inside 24 hours. No pressure, no obligation.
Licensed #193121 · Fully insured · 2-year workmanship warranty

