Trim Installation in Fenway, Boston MA
Installed, caulked and painted as one job so the finish lines up with the walls.
On Fenway properties
Carpentry comes before coating on Fenway exteriors. Most Fenway work is hallways, stairwells and lobbies in occupied buildings — high traffic, tight sequencing, and finishes that have to survive constant use. We repair or replace it first, because paint over soft wood buys a season.
How we do it
Installed, caulked and painted as one job so the finish lines up with the walls.
Scribed to the wall rather than caulked to hide a gap. Mitres get glued, not just nailed, so seasonal movement doesn't open them. Nail holes filled twice — the first fill always shrinks.
The mistake we get called to fix
Relying on caulk to close a quarter-inch gap. It shrinks, cracks and shows a shadow line within a year.
What the quote covers
- Line-by-line scope — prep, materials and labour costed separately
- A real start date and duration, held to
- Licence #193121 and certificate of insurance in writing
- Two-year workmanship warranty
Products are Benjamin Moore and Sherwin-Williams. Worth reading before you hire anyone: Massachusetts State Building Code
Questions We Get Asked
Paint before or after install?
Can you match existing profiles?
Are you licensed and insured?
Ready for Your Trim Installation Estimate in Fenway, Boston?
We walk the property, measure it, and send a written itemised quote — normally inside 24 hours. No pressure, no obligation.
Licensed #193121 · Fully insured · 2-year workmanship warranty

